Scope Summary

  • Full E&I project management from construction to commissioning.
  • Developed execution and control plans, including schedule, cost, and productivity tracking.
  • Implemented QA/QC system aligned with IEC, BS, and client standards.
  • Delivered complete field execution: containment, cabling, terminations, and instrumentation.
  • Supported full pre-commissioning and commissioning, including loop checks and system energisation.

Highlights

  • £6.7M E&I package delivered on time and within budget.
  • Zero LTIs across all project phases.
  • Achieved 100% QA/QC compliance and first-time inspection pass rates.
  • Seamless integration of hydrogen and diesel systems under tight schedule constraints.
  • Strengthened RSN's reputation in high-integrity energy transition projects.

Key Deliverables

  • Complete E&I installation and commissioning.
  • Turnover dossiers, test packs, and red-line as-builts.
  • 0&M documentation and final handover to operations.

Project Overview

  • Project Title: FAST Project
  • Hydrogen & Diesel Production Facility - E&I Construction Client: ExxonMobil
  • Location: Fawley, Southampton Value: £6.7M
  • Sector: Oil & Gas / Energy Transition